I tried something like below but every time its clicking on first link which not considering my date
For i6 = 0 To Iegps.document.all.tags("TD").Length - 1
s6 = Trim(Iegps.document.all.tags("TD").Item(i6).innerText)
If s6 = "EMPLOYER SUBSIDY SUMMARY" Then
'a = Iegps.document.all.tags("TD").Item(i6 - 3).innerText
'subsidy_date = Trim(Right(Iegps.document.all.tags("TD").Item(i6 - 3).innerText, 10))
If subsidy_date = DetachDate Or subsidy_date = "" Then
For i8 = 0 To Iegps.document.all.tags("TD").Length - 1
S8 = Trim(Iegps.document.all.tags("TD").Item(i8).innerText)
If S8 = 01/01/2013 - 03/31/2013 Then
Set colTr = Iegps.document.forms("resultsForm2").getElementsByTagName("TR")
For Each tr In colTr
Set colTD = tr.getElementsByTagName("TD")
For Each td In colTD
If (td.innerText = a) Then
For Each xWorkspace2 In tr.getElementsByTagName("a")
Iegps.navigate xWorkspace2.href
checkclick = checkclick + 1
If xWorkspace2.className = "linkonLite" And Trim(Mid(xWorkspace2, 12, 8)) = "maintain" Then
xWorkspace2.Click
checkclick = checkclick + 1
End If
Next xWorkspace2
End If
Next td
Next tr
End If
Next i8
End If
End If
Next i6